In the 1970s, workloads increased to include additional federal supply classes such as ecclesiastical and mortuary supplies. The center became home to one of the largest data processing facilities on the East Coast. Technological progress was dramatic in the mid-to-late 1960s with four new computer systems being installed that processed more than 4,500 requisitions a day. role in Southeast Asia drove the workload increase and another name change for the installation to Defense General Supply Center.īy 1967, DGSC was procuring more than $731 million worth of general supplies, accounting for $800 million in annual sales. With activation of the Military General Supply Agency in 1960 and its absorption by the Defense Supply Agency in 1962, the depot’s mission expanded to managing more than 30,000 general supply items. The 1950s and 1960s brought the Korean and Vietnam Wars, reorganization and mission expansion to the depot. Employees received, stored and supplied quartermaster, medical and engineering items. World War II marked the peak of depot operations with more than 8,400 people employed who were supplemented by 1,200 German prisoners of war housed on a 50-acre camp adjacent to the depot. Though the installation name has changed through the years, one thing has remained the same, the employees’ commitment to put warfighter support first in all they do. Army Quartermaster Corps, a dedicated, diverse, professional workforce has supported America’s warfighters. Si nce 1942 when the installation first activated as the Richmond General Depot under the command of the U. It has its own interface and does not require update of the robot firmware.Ĭommunication interface: RS232, Ethernet (optional).The History of Defense Logistics Agency Aviation The Black Box is compatible with all Genmark Automation robots. ![]() This feature can extend the warranty for robots not actively in use. The same information allows adjusting the robot warranty term based on the real usage rather than just on a fixed time period. The usage data can be used for lubrication scheduling or belts and motors replacement. The accumulated information provides objective criterion for the need of preventive maintenance procedures. Robot specific information like serial number, calibration data and additional statistical data. Number of faults due to excessive speed/acceleration or overloads caused by robot collisions. The data is in compliance with the SEMI E10-0701 standard. The preserved information includes:Įquipment Uptime, Downtime, Manufacturing Time and Total Running Time. It collects and stores critical information about the robot operation. The Black Box is a small electronic device installed inside the robot body. Vespel, Peek, Teflon impregnated anodized Al, Alumina, Stainless Steel ![]() ![]() Due to its versatility the G-Rex4™ supports diverse tool applications and flexible customizable configurations, including single and dual arm, single and dual blade end-effectors, and vacuum or edge hold support. G-Rex4™ is easy to install, teach, program and troubleshoot. The result is improved dynamics leading to higher acceleration and speed. Because of its simplified designs the G-Rex4™ is a low-mass product with fewer parts and moving components. It features innovative patent-pending designs, advanced control approaches and EZTeach technologies, resulting in improved performance and reliability. The G-Rex4™ robotic system offers dual-arm capability in a small footprint, optimal throughput, reliability and serviceability in a cost effective package. Genmark’s newest robotic series, the G-Rex4™ addresses all current technical specifications for standard payload 300mm and 450mm wafer transport tool applications as the most precise and highest throughput atmospheric robot solution currently available on the market. G-Rex4 ™ Dual Arm Robot System (300/450mm)
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |